INDUSTRIAL/DISTRIBUTION/COMMERCIAL

WAL-MART DISTRIBUTION CENTER - Hurricane, Utah
Civil Project Manager: Responsible for the development and preparation of construction drawings for water, sanitary sewer, storm drainage, telephone, natural gas, and primary electrical routing to serve a 1.2 million square foot facility situated on 200+ acres.  Researched all local, state and federal permitting and plan review requirements and scheduled the permitting activities for project tracking.  Participated in meetings with regulatory agencies to obtain permitting procedures, design requirements, and coordination of utility services.  Assisted client in resolving land purchase issues related to existing easements, encroachments, federal protected wildlife.  Responsible for supervising the design team for the production of all civil construction documents which included the design of interconnected detention pond storm sewer system, domestic and fire protection water systems to serve the facility; and a sanitary sewer system.  Also responsible for the coordination of the design with all building disciplines including architectural, structural, mechanical, plumbing and electrical; preparing the final specifications for the site design package; storm water discharge permit (NPDES).
 
WAL-MART DISTRIBUTION CENTER - Marcy, New York
Civil Project Manager: Responsible for the development and preparation of construction drawings for water, sanitary sewer, storm drainage, telephone, natural gas, and primary electrical routing to serve a 1.2 million square foot facility situated on 200+ acres.
Researched all local, state and federal permitting and plan review requirements and scheduled the permitting activities for project tracking.  Participated in meetings with regulatory agencies to obtain permitting procedures, design requirements, and coordination of utility services.  Assisted client in resolving land purchase issues related to existing easements, encroachments, federal protected wildlife.  Responsible for supervising the design team for the production of all civil construction documents which included the design of interconnected detention pond storm sewer system, domestic and fire protection water systems to serve the facility; and a sanitary sewer system.  Also responsible for the coordination of the design with all building disciplines including architectural, structural, mechanical, plumbing and electrical; preparing the final specifications for the site design package; storm water discharge permit (NPDES).
 
WAL-MART DISTRIBUTION CENTER - Marcy, New York
Preparation of the draft supplemental report  to the Final Generic Environmental Impact Statement for the distribution facility center.
 
WENDY’S SITE PLAN - Fargo, North Dakota
Zoning, site plan and engineering, grading, utilities.
 
SKIPPER’S SITE PLAN - Fargo, North Dakota
Zoning, site plan and engineering, grading, utilities.
 
32 ACRE INDUSTRIAL SITE - North Richland Hills, Texas
Prepared feasibility report for the development of an industrial park.  This included alternate layouts and cost estimates.

PRIVATE DEVELOPMENT

RIVER PARK VILLAGE - Township of Roxbury, Morris County, New Jersey
24.3 acre townhouse development (120 units) - Site planning for preliminary site development, zoning, platting, engineering design of streets, water, sanitary sewer, storm sewer, hydrologic any hydraulic analysis, and floodplain reclamation study.  Permitting of state regulated F-2 trout maintenance river, which required strict design in soil erosion protection and collection of siltation. Coordinate and permitting with the COE on filling of  on 0.731 acres of  wetlands. Local and state permitting with the State of New Jersey Shade Tree Commission,  Storm Water Quality Management Districts, and Soil Conservation Service.
 
CUSHETUNK LAKE - Readington Township, Hunterdon County, New Jersey
210 acre subdivision (Multi-development) - Site planning for preliminary site development, zoning, platting, engineering design of streets, water, sanitary sewer, storm sewer, hydrologic any hydraulic analysis, and floodplain reclamation study.
 
RIVER BEND SUBDIVISION - Oakland, New Jersey
300 acre subdivision (Multi-development) - Site planning for preliminary site development, zoning, platting, engineering design of streets, water, sanitary sewer, storm sewer, and hydrologic any hydraulic analysis.
 
NORTH ARLINGTON LEVEE IMPROVEMENT DISTRICT - Arlington, Texas
Design engineer and project representative for the development of 2000 acres of land to be reclaimed from the Trinity River.  Performed site engineering, hydraulic analysis, structural design of culverts and pump station.
 
AMLI MULTI-FAMILY RESIDENTAL - Ft. Worth, Texas
350 multi-family apartment included site plan, platting, engineering of streets and utilities.  Project under construction.
 
FIRESTONE MULTI-FAMILY PROJECT - Ft. Worth, Texas
350 multi-family apartment located on the west side of downtown Ft. Worth.  Project included consolidating and rezoning 26 properties and vacating of four city streets.  Project under construction.
 
GREENWAYS AT HILLSIDE - Amarillo, Texas
640 acre master plan development for single family, proposed school site, business parks, and commercial site.  Performed zoning and preliminary plat and preliminary engineering.

WATER/WASTEWATER  

1989 SANITARY SEWER REPLACEMENT - Hurst, Texas
Surveying, engineering design, construction staking and appurtenant  construction for approximately 3,200 linear feet of sanitary sewer replacement in three existing subdivisions.
 
WASTEWATER FACILITIES PLAN - Rosholt, South Dakota
Feasibility study of an existing wastewater lagoon system which included site investigation, population study, monitoring of daily effluent discharge, testing city's well water supply for contaminates.
 
RIVER PARK VILLAGE LIFT STATIONS DESIGN - Township of Roxbury, Morris County, New Jersey
Design of two lift stations for sanitary sewer in compliance to local, state, and Department of Protection Agency.
 
NEW SANITARY SEWER SYSTEM - Chaffee, North Dakota
Surveying, design, construction staking consisting of sanitary sewer mains, lift station, and a 3-cell lagoon.

MUNICIPAL SANITARY IMPROVEMENTS - Graceville, Minnesota
Surveying and engineering design of lift station and 730 linear feet force main to provide sanitary sewer extension for residential development.
 
1990-91 WATER MAIN REPLACEMENT - Hurst, Texas
Surveying, engineering design, construction stak­ing and appurtenant construction of approximately 3,000 linear feet of public water main replacement in four different existing subdivisions.
 
EAGLES RIDGE LIFT STATION - Trophy Club, Texas
Design of a duplex pump system to serve a 125 lot single family development.

FEDERAL/U.S. CORP OF ENGINEERS

ELLSWORTH AIR FORCE BASE - Ellsworth, South Dakota
Site engineering and surveying for a maintenance building addition which included appurtenant water and sanitary sewer facilities.
 
USAF STRATEGIC TRAINING RANGE COMPLEX SITE 5 - Dickinson, North Dakota
Site planning and engineering, performed excavation calculations for the entire site.  Design of sanitary sewer system including sewer mains and the wastewater lagoons.  Prepared calculations and specifications in accordance with the Corp. of Engineers requirements.
 
USDA COMPLEX AT NORTH DAKOTA STATE UNIVERSITY - Fargo, North Dakota
Site planning and design of on-site utilities.  Coordination with architects, electrical, and mechanical.
 
EXPAND & RENOVATE MAIN EXCHANGE AT GRAND FORKS AIR FORCE BASE - Grand Forks, North Dakota
Site planning and engineering, coordination with architects, electrical, and mechanical expansion of the Main Exchange building.

AVIATION

FUNCTIONAL AIRPORT REPLACEMENT - Leeds, North Dakota
Project management, coordination and design of a 3,600 linear feet grass runway.  Provided construction inspection, density tests, prepared weekly reports of completed construction, contractor's pay request, and engineering reports to the Highway Department.
 
CITY OF NEW ROCKFORD 1985 AIRPORT PAVING PROJECT - (Tomlinson Field) New Rockford, North Dakota
Upgrade an existing 60-foot wide grass runway to an asphalt surface.  Provided horizontal and vertical calculations for 3,600 linear feet of runway paving. Surface improvement entailed 25,000 s.y. of 4-inch HMAC.
 
MUNICIPAL AIRPORT IMPROVEMENTS - Canby, Minnesota
Resurfacing an existing 60-foot wide runway with HMAC surface improvements on apron area.
 
MADDOCK AIRPORT RUNWAY DESIGN - Maddock, North Dakota
Survey, design and construction staking of  3,600 linear feet of a grass runway.
 
FRISCO AIRPORT- Frisco, Texas
Site engineering and earthwork calculations for runway and taxiway.

MUNICIPAL

1984 ASPHALT PAVING & RELATED ITEMS - Chrisan Subdivision, Cass County, North Dakota
Surveying of existing gravel streets, horizontal and vertical control reestablished for the asphalt paving of 3,400 linear feet of residential streets.   Included bar ditch improvements and hydraulic design of culverts.
 
1984 ASPHALT PAVING, SEAL COAT AND RELATED ITEMS - Riverdale Subdivision, Cass County, North Dakota
Surveying of existing gravel streets, horizontal and vertical control reestablished for HMAC paving improvements.  
 
HOLMEN’S 2nd SUBDIVISION ASPHALT PAVING - Horace, North Dakota
Surveying of existing streets, reestablished vertical and horizontal control for asphalt resurfacing.
 
HOLDEN’S 3nd SUBDIVISION ASPHALT PAVING - Horace, North Dakota
Surveying of existing streets, reestablished vertical and horizontal control for asphalt resurfacing.
 
PREWETT ROAD IMPROVEMENTS - Ft. Worth, Texas
Site engineering of existing asphalt road to an improved concrete street. Horizontal and vertical design of 5,200 linear feet of street, relocation of existing utilities, and storm sewer design.
 
FUNCTIONAL BALL DIAMOND REPLACEMENT -Leeds, North Dakota
Surveying, horizontal/ vertical control, site grading, and construction staking of a city softball field.
 
CASSELTON RUNNING TRACK - Casselton, North Dakota
Surveying and grading improvements to the existing high school running track.  Included regrading of perimeter of running field with HMAC installation..
 
FRONTIER CULVERT STUDY - Frontier, North Dakota
Inspection and analysis of existing culverts to provide a recommendation and cost estimates based field investigation.
 
CHAFFEE DITCH STUDY - Chaffee, North Dakota
Inspect and survey approximate 1.5 miles of existing ditches to recommend a plan of action to alleviate ponding problems.
 
CITY OUTDOOR SWIMMING POOL - Barnesville, Minnesota
Surveying, horizontal and vertical control of swimming facility with site grading.
 
CITY OUTDOOR SWIMMING POOL - Red Lake Falls, Minnesota
Surveying, horizontal and vertical control of swimming facility, site grading, water line and sanitary sewer extension.

 

 

PROJECT HISTORY: 1984 to 1998 partial list